Based on Kumho E&C's construction philosophy
every building is a piece of art, the buildings built by
Kumho E&C became the symbols of the cities. Kumho
E&C is recognized as the pioneer of construction with
outstanding construction capabilities and eco-friendly
architec- tural technology.
Based on Kumho E&C's construction philosophy
every building is a piece of art, the buildings built by
Kumho E&C became the symbols of the cities. Kumho
E&C is recognized as the pioneer of construction with
outstanding construction capabilities and eco-friendly
architec- tural technology.
Based on Kumho E&C's construction philosophy
every building is a piece of art, the buildings built by
Kumho E&C became the symbols of the cities. Kumho
E&C is recognized as the pioneer of construction with
outstanding construction capabilities and eco-friendly
architec- tural technology.
Based on Kumho E&C's construction philosophy
every building is a piece of art, the buildings built by
Kumho E&C became the symbols of the cities. Kumho
E&C is recognized as the pioneer of construction with
outstanding construction capabilities and eco-friendly
architec- tural technology.
Based on Kumho E&C's construction philosophy
every building is a piece of art, the buildings built by
Kumho E&C became the symbols of the cities. Kumho
E&C is recognized as the pioneer of construction with
outstanding construction capabilities and eco-friendly
architec- tural technology.
Based on Kumho E&C's construction philosophy
every building is a piece of art, the buildings built by
Kumho E&C became the symbols of the cities. Kumho
E&C is recognized as the pioneer of construction with
outstanding construction capabilities and eco-friendly
architec- tural technology.
From airports to bridges, tunnels, railways, ports
and roads that connect between cities and the
territory, Kumho E&C has extensive experience and
differentiated know-how in all areas of large-scale
SOC projects. Kumho E&C takes the firm position
as the leader of the airport project as it has com
pleted Incheon Int'l airport, Yangyang airport, Jeju
airport, Gimhae airport, and Muan airport, for which
the company has completed the entire process from
design to construction and commissioning.
From airports to bridges, tunnels, railways, ports
and roads that connect between cities and the
territory, Kumho E&C has extensive experience and
differentiated know-how in all areas of large-scale
SOC projects. Kumho E&C takes the firm position
as the leader of the airport project as it has com
pleted Incheon Int'l airport, Yangyang airport, Jeju
airport, Gimhae airport, and Muan airport, for which
the company has completed the entire process from
design to construction and commissioning.
From airports to bridges, tunnels, railways, ports
and roads that connect between cities and the
territory, Kumho E&C has extensive experience and
differentiated know-how in all areas of large-scale
SOC projects. Kumho E&C takes the firm position
as the leader of the airport project as it has com
pleted Incheon Int'l airport, Yangyang airport, Jeju
airport, Gimhae airport, and Muan airport, for which
the company has completed the entire process from
design to construction and commissioning.
From airports to bridges, tunnels, railways, ports
and roads that connect between cities and the
territory, Kumho E&C has extensive experience and
differentiated know-how in all areas of large-scale
SOC projects. Kumho E&C takes the firm position
as the leader of the airport project as it has com
pleted Incheon Int'l airport, Yangyang airport, Jeju
airport, Gimhae airport, and Muan airport, for which
the company has completed the entire process from
design to construction and commissioning.
From airports to bridges, tunnels, railways, ports
and roads that connect between cities and the
territory, Kumho E&C has extensive experience and
differentiated know-how in all areas of large-scale
SOC projects. Kumho E&C takes the firm position
as the leader of the airport project as it has com
pleted Incheon Int'l airport, Yangyang airport, Jeju
airport, Gimhae airport, and Muan airport, for which
the company has completed the entire process from
design to construction and commissioning.
From airports to bridges, tunnels, railways, ports
and roads that connect between cities and the
territory, Kumho E&C has extensive experience and
differentiated know-how in all areas of large-scale
SOC projects. Kumho E&C takes the firm position
as the leader of the airport project as it has com
pleted Incheon Int'l airport, Yangyang airport, Jeju
airport, Gimhae airport, and Muan airport, for which
the company has completed the entire process from
design to construction and commissioning.
Kumho E&C is building smart future-oriented
advanced residential complex with eco-friendly
design and leading-edge Ubiquitous system.
The 'Eullim' brand apartment, representing har
mony with neighbors, nature and advanced
living, leads the advanced housing culture.
Kumho E&C is building smart future-oriented
advanced residential complex with eco-friendly
design and leading-edge Ubiquitous system.
The 'Eullim' brand apartment, representing har
mony with neighbors, nature and advanced
living, leads the advanced housing culture.
In the field of plant/environment business, Kumho
E&C has developed the high efficiency membrane
filtration seawater desalination facility based on its
leading technical skills on water treatment process.
The company also has an extensive experience in
building combined cogeneration plants and thermal
power plants. Kumho E&C will strengthen its com
petitiveness in all the fields of plant / environment
business by pioneering new markets for wind
power generation, bio gas generation and nuclear
power generation.
In the field of plant/environment business, Kumho
E&C has developed the high efficiency membrane
filtration seawater desalination facility based on its
leading technical skills on water treatment process.
The company also has an extensive experience in
building combined cogeneration plants and thermal
power plants. Kumho E&C will strengthen its com
petitiveness in all the fields of plant / environment
business by pioneering new markets for wind
power generation, bio gas generation and nuclear
power generation.
In the field of plant/environment business, Kumho
E&C has developed the high efficiency membrane
filtration seawater desalination facility based on its
leading technical skills on water treatment process.
The company also has an extensive experience in
building combined cogeneration plants and thermal
power plants. Kumho E&C will strengthen its com
petitiveness in all the fields of plant / environment
business by pioneering new markets for wind
power generation, bio gas generation and nuclear
power generation.
In the field of plant/environment business, Kumho
E&C has developed the high efficiency membrane
filtration seawater desalination facility based on its
leading technical skills on water treatment process.
The company also has an extensive experience in
building combined cogeneration plants and thermal
power plants. Kumho E&C will strengthen its com
petitiveness in all the fields of plant / environment
business by pioneering new markets for wind
power generation, bio gas generation and nuclear
power generation.
In the field of plant/environment business, Kumho
E&C has developed the high efficiency membrane
filtration seawater desalination facility based on its
leading technical skills on water treatment process.
The company also has an extensive experience in
building combined cogeneration plants and thermal
power plants. Kumho E&C will strengthen its com
petitiveness in all the fields of plant / environment
business by pioneering new markets for wind
power generation, bio gas generation and nuclear
power generation.
-
Jeju Airport Overpass
- Location : Jeju International Airport
- Construction period : May 5, 2009 ~ December 30, 2012
- scale : Overpass Total length: L = 624m
-
Puerto Princesa International Airport
- Location : Palawan The Phillippines
- Construction period : August 2014 ~ January 2017
- Area : 34,082§³
-
Re-paving of Seoul Runway
- Location : Simgok-ro, Sujeong-gu, Seongnam-si, Gyeonggi-do, Republic of Korea
- Construction period : June 2013 ~ June 2016
-
Common Duct, Guide Line (R17) and Bridge Structure work (Sections 3-5) for Incheon International Airport Phase 3
- Location : Gonghang-ro, Jung-gu, Incheon, Republic of Korea
- Construction period : January 2014 ~ December 2018
-
Muan International Airport
- Location : Piseo-ri, Mangun-myeon, Muan-gun, Jeollanam-do, Korea
- Construction period : December 1999 ~ December 2008
- scale : Runway and taxiway 1 (length: 2.8Km), Passenger terminal and other eight attached buildings
- Epitome : - Project site: 2,532,000§³
- Runway: 2,800M ¡¿45M (1set)
- Parallel taxiway: 2,800M ¡¿23M (1set)
- Perpendicular taxiway: 182.5M ¡¿23M (3 places)
- Apron: 90,692§³ (9 airplanes parking at the same time)
- Passenger terminal: 29,106§³ (international and domestic)
- Freight terminal: 3,112§³ (international and domestic)
- Parking lot: 66,990§³ (2,095 cars parking at the same time)
- Power building, control tower, other attached facilities: 17,1532§³
- Access road: 1,900M (4 lanes)
- Radio navigation aids: 1set
- Aeronautical Light Aids: 1set
- Radar facility: 1set
- Other attached facilities: 1set