Based on Kumho E&C's construction philosophy
every building is a piece of art, the buildings built by
Kumho E&C became the symbols of the cities. Kumho
E&C is recognized as the pioneer of construction with
outstanding construction capabilities and eco-friendly
architec- tural technology.
Based on Kumho E&C's construction philosophy
every building is a piece of art, the buildings built by
Kumho E&C became the symbols of the cities. Kumho
E&C is recognized as the pioneer of construction with
outstanding construction capabilities and eco-friendly
architec- tural technology.
Based on Kumho E&C's construction philosophy
every building is a piece of art, the buildings built by
Kumho E&C became the symbols of the cities. Kumho
E&C is recognized as the pioneer of construction with
outstanding construction capabilities and eco-friendly
architec- tural technology.
Based on Kumho E&C's construction philosophy
every building is a piece of art, the buildings built by
Kumho E&C became the symbols of the cities. Kumho
E&C is recognized as the pioneer of construction with
outstanding construction capabilities and eco-friendly
architec- tural technology.
Based on Kumho E&C's construction philosophy
every building is a piece of art, the buildings built by
Kumho E&C became the symbols of the cities. Kumho
E&C is recognized as the pioneer of construction with
outstanding construction capabilities and eco-friendly
architec- tural technology.
Based on Kumho E&C's construction philosophy
every building is a piece of art, the buildings built by
Kumho E&C became the symbols of the cities. Kumho
E&C is recognized as the pioneer of construction with
outstanding construction capabilities and eco-friendly
architec- tural technology.
From airports to bridges, tunnels, railways, ports
and roads that connect between cities and the
territory, Kumho E&C has extensive experience and
differentiated know-how in all areas of large-scale
SOC projects. Kumho E&C takes the firm position
as the leader of the airport project as it has com
pleted Incheon Int'l airport, Yangyang airport, Jeju
airport, Gimhae airport, and Muan airport, for which
the company has completed the entire process from
design to construction and commissioning.
From airports to bridges, tunnels, railways, ports
and roads that connect between cities and the
territory, Kumho E&C has extensive experience and
differentiated know-how in all areas of large-scale
SOC projects. Kumho E&C takes the firm position
as the leader of the airport project as it has com
pleted Incheon Int'l airport, Yangyang airport, Jeju
airport, Gimhae airport, and Muan airport, for which
the company has completed the entire process from
design to construction and commissioning.
From airports to bridges, tunnels, railways, ports
and roads that connect between cities and the
territory, Kumho E&C has extensive experience and
differentiated know-how in all areas of large-scale
SOC projects. Kumho E&C takes the firm position
as the leader of the airport project as it has com
pleted Incheon Int'l airport, Yangyang airport, Jeju
airport, Gimhae airport, and Muan airport, for which
the company has completed the entire process from
design to construction and commissioning.
From airports to bridges, tunnels, railways, ports
and roads that connect between cities and the
territory, Kumho E&C has extensive experience and
differentiated know-how in all areas of large-scale
SOC projects. Kumho E&C takes the firm position
as the leader of the airport project as it has com
pleted Incheon Int'l airport, Yangyang airport, Jeju
airport, Gimhae airport, and Muan airport, for which
the company has completed the entire process from
design to construction and commissioning.
From airports to bridges, tunnels, railways, ports
and roads that connect between cities and the
territory, Kumho E&C has extensive experience and
differentiated know-how in all areas of large-scale
SOC projects. Kumho E&C takes the firm position
as the leader of the airport project as it has com
pleted Incheon Int'l airport, Yangyang airport, Jeju
airport, Gimhae airport, and Muan airport, for which
the company has completed the entire process from
design to construction and commissioning.
From airports to bridges, tunnels, railways, ports
and roads that connect between cities and the
territory, Kumho E&C has extensive experience and
differentiated know-how in all areas of large-scale
SOC projects. Kumho E&C takes the firm position
as the leader of the airport project as it has com
pleted Incheon Int'l airport, Yangyang airport, Jeju
airport, Gimhae airport, and Muan airport, for which
the company has completed the entire process from
design to construction and commissioning.
Kumho E&C is building smart future-oriented
advanced residential complex with eco-friendly
design and leading-edge Ubiquitous system.
The 'Eullim' brand apartment, representing har
mony with neighbors, nature and advanced
living, leads the advanced housing culture.
Kumho E&C is building smart future-oriented
advanced residential complex with eco-friendly
design and leading-edge Ubiquitous system.
The 'Eullim' brand apartment, representing har
mony with neighbors, nature and advanced
living, leads the advanced housing culture.
In the field of plant/environment business, Kumho
E&C has developed the high efficiency membrane
filtration seawater desalination facility based on its
leading technical skills on water treatment process.
The company also has an extensive experience in
building combined cogeneration plants and thermal
power plants. Kumho E&C will strengthen its com
petitiveness in all the fields of plant / environment
business by pioneering new markets for wind
power generation, bio gas generation and nuclear
power generation.
In the field of plant/environment business, Kumho
E&C has developed the high efficiency membrane
filtration seawater desalination facility based on its
leading technical skills on water treatment process.
The company also has an extensive experience in
building combined cogeneration plants and thermal
power plants. Kumho E&C will strengthen its com
petitiveness in all the fields of plant / environment
business by pioneering new markets for wind
power generation, bio gas generation and nuclear
power generation.
In the field of plant/environment business, Kumho
E&C has developed the high efficiency membrane
filtration seawater desalination facility based on its
leading technical skills on water treatment process.
The company also has an extensive experience in
building combined cogeneration plants and thermal
power plants. Kumho E&C will strengthen its com
petitiveness in all the fields of plant / environment
business by pioneering new markets for wind
power generation, bio gas generation and nuclear
power generation.
In the field of plant/environment business, Kumho
E&C has developed the high efficiency membrane
filtration seawater desalination facility based on its
leading technical skills on water treatment process.
The company also has an extensive experience in
building combined cogeneration plants and thermal
power plants. Kumho E&C will strengthen its com
petitiveness in all the fields of plant / environment
business by pioneering new markets for wind
power generation, bio gas generation and nuclear
power generation.
In the field of plant/environment business, Kumho
E&C has developed the high efficiency membrane
filtration seawater desalination facility based on its
leading technical skills on water treatment process.
The company also has an extensive experience in
building combined cogeneration plants and thermal
power plants. Kumho E&C will strengthen its com
petitiveness in all the fields of plant / environment
business by pioneering new markets for wind
power generation, bio gas generation and nuclear
power generation.
-
Site of Siem Reap river sewage treatment plant (STP)
- Location : Siem Reap, Cambodia
- Construction period : November 1, 2011 ~ April 19, 2014
- scale : STP extension, rain & sewage pipe, river improvement construction
- Epitome : 1) STP: Capacity 5,224§©/day
2) Rain pipe: 4.85km
3) Sewage pipe: 11.04km
4) Transit pump station (2 places): (13,127§©/day, 11,335§©/day)
5) Siem Reap river improvement: 3.57km
-
Cambodia national highway 56
- Location : Cambodia national highway 56
- Construction period : February 1, 2012 ~ May 20, 2014 (28 months)
- scale : Improvement of the existing roads, and new construction (Length: 84km, Width: 11m)
- Epitome : 1) Road improvement (banking and DBST pavement) : L = 84km
2) Bridge (1)
3) Box Culvert (2), drainage, mine clearance operation, etc.
-
Krang Ponley dam site
- Location : Krang Ponley, Cambodia
- Construction period : November 17, 2008 ~ February 29, 2012 (40 months)
- scale : Improvement, new construction of 3 banks, small hydro power generation
- Epitome : 1) Earthwork: 3 dams (9.13km)
2) Waterway (2 places)
3) Structure (31)
4) Mechanical/Electric works: floodgate (52)
5) Small hydro power generator 2 (200KW)
-
Al-Marjan infrastructure works
- Location : Around Al-Marjan Island, U.A.E
- Construction period : June 29, 2008 ~ December 31, 2011 (42 months)
- Epitome : 1)¡¤Road Works- Asphalt pavement ( L =4.0km ), Channel Crossing (1 place)
2) Infrastructure Works: sewage, rain, water supply, irrigation canal, communication conduit, etc.
3) Structural Works: Potable Water Reservoir, Irrigation Reservoir
4) Appurtenant work: 1set